McMurphy Water Diversion and Onstream Ponds Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-10528-R1)

798 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
McMurphy Water Diversion and Onstream Ponds Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-10528-R1)
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2020
Document Description
The project is limited to four encroachments: 1) a spring point of diversion (POD) near the residence is diverted to storage tanks for domestic use. 2) This spring feeds an onstream-reservoir (“Pond 1”). Work will include removal of the berm and culvert at the inlet of the reservoir, and restoration of the stream channel near the inlet. 3) Water flows from “Pond 1” into a second onstream reservoir (“Pond 2”). Permittee diverts water from these reservoirs for the purpose of commercial irrigation. 4). A third onstream reservoir (“Pond 3”) impounds a spring and seep adjacent to a cultivation area. “Pond 3” appears recently reconstructed. CDFW could find no LSAA for this work, nor any water rights associated with this reservoir. Permittee shall render “Pond 3” incapable of storing water and decommission and remediate the reservoir.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
The project is located within the Van Duzen River watershed, approximately 1.3 miles northwest of the town of Dinsmore, County of Humboldt, State of California; Section 5, T1N, R5E, Humboldt Base and Meridian, in the Larabee Valley U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 208-281-032.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print