Ellsworth Water Diversion, Stream Crossings and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2018-0282-R1)
525 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Ellsworth Water Diversion, Stream Crossings and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2018-0282-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/14/2020
- Project Applicant
- Humboldt County
- Document Description
- The project is limited to 13 encroachments (Table 1). Two encroachments are for water diversion from unnamed tributaries to Windy Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Nine encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Two encroachments are for stream restoration, including the decommissioning of an onstream reservoir.
- Contact Information
-
Cheri Sanville
Department of Fish and Wildlife
619 Second Street
Eureka, CA 95501
Phone : (707) 441-5901
Location
- Counties
- Humboldt
- Other Location Info
- The project is located within the Redwood Creek watershed, approximately 10.8 miles east of the town of Blue Lake, County of Humboldt, State of California; Section 24, T06N, R03E, Humboldt Base and Meridian, in the Lord-Ellis Summit U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Numbers 316-174-015 & 316-174-007; latitude 40.8947 N, longitude 123.7837 W at the first point of diversion (POD-1).
Notice of Determination
- Approving Agency
- Department of Fish and Wildlife
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- The mitigated negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record related to the Lake or Streambed Alteration Agreement is available to the public for review at CDFW’s regional office.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2015102005_Ellsworth Water Diversion_1600-2018-0282-R1_HUM_MJ_Ellsworth_Water Diversion Pond and Stream Crossings PDF 181 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.