Pennington Water Diversion, Micro-hydroelectric, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0298-R1)

236 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Pennington Water Diversion, Micro-hydroelectric, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0298-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0298-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. Pennington. The project consists of three encroachment(s): One encroachment is for water diversion from an Unnamed Tributary to Rosaleno Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of water diversion infrastructure. One encroachment is for a Micro-hydroelectric system. Water is diverted for non-consumptive Micro-hydroelectric power generation. Work for this will include use and maintenance of the water diversion infrastructure. The other proposed encroachment is to upgrade an undersized culvert. Work for this encroachment will include excavation, removal of the failing culvert, replacement with a new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information
Kalyn Bocast
CDFW
619 Second St.
Eureka, CA 95501

707-441-2077

Location

Counties
Humboldt
Other Location Info
Redway

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second St., Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search