Studebaker Stream Crossings and Bank Stabilization Project (Streambed Alteration Agreement No. 1600-2018-0730-R1)

739 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Studebaker Stream Crossings and Bank Stabilization Project (Streambed Alteration Agreement No. 1600-2018-0730-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2020
Document Description
The project is limited to three encroachments (Table 1). One encroachment involves an existing reservoir located adjacent to a stream. Work will involve hydrologically disconnecting the reservoir outlet from the stream and directing flow to a rocked bioswale. Permittee shall implement a Bullfrog Monitoring and Management Plan for the reservoir. One encroachment is upgrade an undersized stream crossing. Work for this encroachment will include excavation, removal of the existing culvert, replacement with new properly sized crossing, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One encroachment is for a combination of stream crossing upgrade and streambank stabilization completed pursuant to a plan prepared by a California licensed engineer.

Contact Information

Name
Steven Lazar
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Lead/Public Agency

Location

Cities
Redway
Counties
Humboldt
Cross Streets
Redwood Creek watershed
Parcel #
220-261-008
Township
04S
Range
03E
Section
8
Base
HBM
Other Location Info
Briceland U.S. Geological Survey 7.5-minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print