Ryan Water Diversion Project,1 Encroachment (LSAA 1600-2019-0569-R1)

809 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Ryan Water Diversion Project,1 Encroachment (LSAA 1600-2019-0569-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2019
Document Description
The project is limited to one encroachment. One encroachment is for water diversion from Tostin Creek. Water is diverted for domestic use only. Work for the water diversion will include use and maintenance of the water diversion infrastructure. 4 rain catchment ponds labeled (A, B, C, & D) that are included only as described features within this Agreement. The ponds are described as rainwater catchment. All ponds A, B, C, and D are lined with black plastic have approximately a 3: 1 sloped bank, with outlets that require additional rocking and addition of escapement ramps for wildlife. No notification is required to conduct this work since these descriptive features are not subject to 1600 code. These rain catchment ponds are geographically located on the top of a ridge and are hydrologically disconnected from all streams.

Contact Information

Name
Christine Hahn Vertical
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
212-015-020
Township
03S
Range
03E
Section
29
Base
HB&M
Other Location Info
The project to be completed is located within the South Fork Eel River watershed, approximately 5.8 miles SW of the town of Miranda, County of Humboldt, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.