Kore Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-05788-R1)

809 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Kore Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-05788-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2019
Document Description
The project is limited to one (1) encroachment (Table 1) to remove an undersized culvert and restore the stream channel. Work for this encroachment will include excavation, removal of the failing culvert, and setting back the slope to restore the stream channel. The Notification discloses a water well located at Lat/Long 39.3662, -123.2536. This well is presented as the sole source of water for all needs on the property. CDFW did not evaluate hydraulic connection of the well to surface water, nor was a hydrogeologic evaluation prepared by a licensed geologist provided for CDFW review. The Notification discloses a spring and pool within a stream that shall be evaluated during a CDFW site inspection. If work is deemed necessary, then the Permittee may be required to notify. No water diversion is authorized from this spring. No other projects that may be subject to FGC section 1602 were disclosed. This Agreement does not retroactively permit any stream crossings, water diversions or other encroachments not described in Table 1 .

Contact Information

Name
Andrew Orahoske
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Parcel #
105-300-110
Township
18N
Range
13W
Section
36
Base
MDB&M
Other Location Info
The project to be completed is located within the Upper Eel River watershed, approximately 5.7 miles SE of the town of Willits, County of Mendocino, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print