Honchar Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0151-R1)

301 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Honchar Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0151-R1)
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2019
Project Applicant
Humboldt County Dept. of Planning and Building

Document Description
The project is limited to three encroachments (Table 1 ). One encroachment is for removing an onstream impoundment. Two other proposed encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill , and rock armoring as necessary to minimize erosion.

Contact Information
Cheri Sanville
Department of Fish and Wildlife
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5901

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Lower Eel River watershed, approximately 2.98 miles SW of the town of Dinsmore, County of Humboldt, State of California. The project is located in Section 20, T01 , R05, Humboldt Base and Meridian; in the Larabee Valley U.S. Geological Survey 7.5-minute quadrangle; Humboldt County Assessor's Parcel Number 210-231-017; latitude 40.4510 N and longitude -123.6288 W at the first stream crossing.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The mitigated negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFWs record related to the Lake or Streambed Alteration Agreement is available to the public for review at CDFWs regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print