Kovacs Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0284-R1)

798 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Kovacs Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0284-R1)
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2019
Document Description
The project is limited to four encroachments. Two encroachments are for water diversion from unnamed tributaries to Salmon Creek. Water is diverted for domestic use, irrigation, and micro-hydro power generation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The two other proposed encroachments are to a poorly installed culvert and to decommission another stream crossing. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill , and rock armoring as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Humboldt County
Contact Types
Project Applicant

Location

Cities
Miranda
Counties
Humboldt
Other Location Info
The project to be completed is located within the Salmon Creek watershed, approximately 3.6 miles southwest of the town of Miranda, County of Humboldt, State of California. The project is located in Section 18, T3S, R3E, Humboldt Base and Meridian; in the Miranda and Ettersburg U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Number 219-041-012; latitude 40.1994 N and longitude 123.8770 W.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print