Early Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0335-R1)
809 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Early Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0335-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2019
Document Description
The project includes twenty-four encroachments. Three encroachments are for water diversion from unnamed tributaries to Cooper Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The twenty-one other proposed encroachments are
to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, rocked fords, or bridges, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
David Manthorne
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Project Applicant
Location
Cities
Blocksburg
Counties
Humboldt
Other Location Info
The project to be completed is located within the Larabee Creek and Eel River
watersheds, approximately 3 miles northeast of the town of Blacksburg, County of Humboldt, State of California. The project is located in Sections 3, 9, and 10, T2S, R5E, Humboldt Base and Meridian; in the Black Lassie U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Numbers 217-244-007, 217-244-004, 217-251-003, and 217-225-007; latitude 40.3103N and longitude 123.6136 Wat the point of diversion (POD).
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.