Childs Water Extraction and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0817-R1)
798 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Childs Water Extraction and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0817-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2019
Document Description
The project is limited to four (4) encroachments (Table 1). One (1) encroachment is for water extraction from a well. The information available about the well indicates a high likelihood of hydrological connection and a hydrogeological evaluation conducted by a licensed geologist was not provided. Work for the water extraction will include use and maintenance of the well and water use infrastructure. The Agreement requires monthly reporting of total water extraction from the well and, also requires seasonal water extraction minimization, limiting water extraction from the well to 200 gallons per day from August 1 - October 31 annually. The three (3) other proposed encroachments are to upgrade failing and undersized culverts and install a rocked ford to replace one undersized culvert.
See NOD for full details.
Contact Information
Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 0.5 miles east of the town of Redcrest, County of Humboldt, State of California.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.