Gienger Water Diversion and Stream Crossings Projects (Lake or Stream bed Alteration Agreement No. 1600-2018-0858-R1)

270 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Gienger Water Diversion and Stream Crossings Projects (Lake or Stream bed Alteration Agreement No. 1600-2018-0858-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2019

Document Description
The project is limited to five encroachments (Table 1). One encroachment is for water diversion from an unnamed tributary to the Mattole River. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The four other proposed encroachments are to retroactively permit existing crossings where either no work or only maintenance is proposed. An Amendment or separate Notification is required to replace these crossings since the Notification specifies, they are adequately sized and functioning properly, and no work is proposed. CDFW may recommend additional work or replacement upon site inspection.

Contact Information
Cheri Sanville
Department of Fish and Wildlife Northern Region
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5901

Location

Coordinates
40.0898°'"N 123.9385°'"W
Counties
Humboldt
Parcel #
215-151-002
Township
5S
Range
2E
Section
3
Base
HB&M
Other Location Info
The project to be completed is located within the Mattole River watershed, approximately 7 miles SW of the town of Redway, County of Humboldt, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2015102005_1600-2018-0858-R1_HUM_MJ Gienger Water Diversion and Stream Crossings_NOD   PDF 595 K