Kinsinger Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0696-R1)

803 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Kinsinger Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0696-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2019
Document Description
The project is limited to five encroachments. One encroachment is for water diversion from unnamed tributaries to Dairy Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The three other proposed encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The fifth proposed encroachment is to decommission a small on-stream pond and restore the stream channel.

Contact Information

Name
Greg O'Connell
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 5 miles south of the town of Dinsmore, County of Humboldt, State of California. The project is located in Section 35, T01 N, 05E, Humboldt Base and Meridian; in the Dinsmore U.S. Geological Survey 7.5-minute quadrangle; Humboldt County Assessor's Parcel Numbers 210-141-002 and 210-141-012; latitude 40.42273587 N and longitude 123.5736149 Wat the point of diversion.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print