Patel Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0059-R1)

285 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Patel Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2019-0059-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2019

Document Description
The project is limited to two (2) encroachments (Table 1). One (1) encroachment is for water diversion from Mule Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure according to a Diversion Infrastructure Plan approved by the Department. One (1) proposed encroachment is to decommission a stream crossing by removing approximately 1-2 cubic yards of fill in the stream channel and to implement stream restoration through native revegetation.

Contact Information
Cheri Sanville
Department of Fish and Wildlife Northern Region
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5901

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Van Duzen River watershed, approximately 6 miles east southeast of the town of Bridgeville, County of Humboldt, State of California. The project is located in Section 26, T01 N, R04E, Humboldt Base and Meridian; in the Larabee Valley U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Number 210-071-013; latitude 40.4288 N and longitude 123. 7008 W at the point of diversion (POD).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2015102005_1600-2019-0059-R1_HUM_MJ Patel GLG Water Diversion & Stream Crossings_NOD   PDF 603 K
Download CSV New Search