Hoisington Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0122-R1)

809 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Hoisington Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0122-R1)
Document Type
NOD - Notice of Determination
Received
Posted
4/15/2019
Document Description
The project consists of 3 encroachment(s): The first encroachment is for water diversion from unnamed tributaries to Basin Creek. Water is diverted for domestic use and irrigation into a rain catchment pond. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The second encroachment includes the decommissioning of an existing 18" CCP culvert that transitions into a 24" CMP culvert on a Class Ill watercourse. The third encroachment includes reconstructing an existing rock ford on a Class II watercourse with larger diameter washed rock. Work for these encroachments will include excavation, removal of the failing culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Township
2S
Range
4E
Section
24
Base
HBM
Other Location Info
The project to be completed is located within the Basin Creek watershed, approximately 3 miles west of the town of Blacksburg, County of Humboldt, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print