Bilandzija Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2015-0031-R1)
535 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Bilandzija Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2015-0031-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/11/2019
- Document Description
- The project is limited to three encroachments. One encroachment is for water diversion from Powers Creek. Water may be diverted for domestic use and irrigation. The surface water POD will be permitted through this agreement but is not currently in place. A groundwater well currently serves as the main water source for both domestic and irrigation use. Work for the water diversion will include installation, use, and maintenance of the water diversion infrastructure. The two other proposed encroachments are to upgrade and undersized culvert, and to install a new culvert at a road stream crossing where no infrastructure exists. Work for these encroachments will include excavation, removal of a culvert, replacement with new culvert, installation of a new culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
- Contact Information
-
David Manthorne
CDFW
Lead/Public Agency
619 Second Street
Eureka, CA 95501
Phone : (707) 441-5900
Location
- Coordinates
- 40.1465N°'"N 123.6500W°'"W
- Counties
- Humboldt
- Parcel #
- 216-381-032
- Township
- 4S
- Range
- 5E
- Section
- 5
- Base
- HBM
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second Street, Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No