Bilandzija Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2015-0031-R1)

299 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Bilandzija Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2015-0031-R1)
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2019

Document Description
The project is limited to three encroachments. One encroachment is for water diversion from Powers Creek. Water may be diverted for domestic use and irrigation. The surface water POD will be permitted through this agreement but is not currently in place. A groundwater well currently serves as the main water source for both domestic and irrigation use. Work for the water diversion will include installation, use, and maintenance of the water diversion infrastructure. The two other proposed encroachments are to upgrade and undersized culvert, and to install a new culvert at a road stream crossing where no infrastructure exists. Work for these encroachments will include excavation, removal of a culvert, replacement with new culvert, installation of a new culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information
David Manthorne
CDFW
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5900

Location

Coordinates
40.1465N°'"N 123.6500W°'"W
Counties
Humboldt
Parcel #
216-381-032
Township
4S
Range
5E
Section
5
Base
HBM

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print