Bilandzija Water Diversion, Stream Crossings, and Pond Removal Project (Lake or Streambed Alteration Agreement No. 1600-2018-0742-R1)
535 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Bilandzija Water Diversion, Stream Crossings, and Pond Removal Project (Lake or Streambed Alteration Agreement No. 1600-2018-0742-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/5/2019
- Present Land Use
- The project applies across all land use designations
- Document Description
- The project is limited to 6 encroachments. One encroachment is for water diversion from an unnamed tributary to Power Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include modification, use , and maintenance of the water diversion infrastructure. Four proposed encroachment are to upgrade failing and undersized culverts. The final proposed encroachment will remove an on-stream pond that is fed by springs. Work for these encroachments will include excavation, removal of failing culverts, replacement with new properly sized culverts, backfilling's and compaction of fill, and rock as necessary to minimize erosion.
- Contact Information
-
David Manthorne
CDFW, Northern Region
Lead/Public Agency
619 Second St
Eureka, CA 95501
Phone : (707) 441-5900
Location
- Coordinates
- 40.1444°'"N 123.6492°'"W
- Counties
- Humboldt
- Parcel #
- 216-381-034 and 216-381-035
- Waterways
- Powers Creek and Eel River
- Township
- 4S
- Range
- 5E
- Section
- 5
- Base
- HB&M
- Other Location Info
- town of Briceland
- Other Information
- in the Briceland, U.S. Geological survery 7.5 minute quadrangle
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second Street, Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.