Bilandzija Water Diversion, Stream Crossings, and Pond Removal Project (Lake or Streambed Alteration Agreement No. 1600-2018-0742-R1)

271 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Bilandzija Water Diversion, Stream Crossings, and Pond Removal Project (Lake or Streambed Alteration Agreement No. 1600-2018-0742-R1)
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2019
Present Land Use
The project applies across all land use designations

Document Description
The project is limited to 6 encroachments. One encroachment is for water diversion from an unnamed tributary to Power Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include modification, use , and maintenance of the water diversion infrastructure. Four proposed encroachment are to upgrade failing and undersized culverts. The final proposed encroachment will remove an on-stream pond that is fed by springs. Work for these encroachments will include excavation, removal of failing culverts, replacement with new properly sized culverts, backfilling's and compaction of fill, and rock as necessary to minimize erosion.

Contact Information
David Manthorne
CDFW, Northern Region
619 Second St
Eureka, CA 95501

Phone : (707) 441-5900

Location

Coordinates
40.1444°'"N 123.6492°'"W
Counties
Humboldt
Parcel #
216-381-034 and 216-381-035
Waterways
Powers Creek and Eel River
Township
4S
Range
5E
Section
5
Base
HB&M
Other Location Info
town of Briceland
Other Information
in the Briceland, U.S. Geological survery 7.5 minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No