Iliev Crossings Project ( Lake or Streambed Alterations Agreement No. 1600-2018-0086-R1)
536 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Iliev Crossings Project ( Lake or Streambed Alterations Agreement No. 1600-2018-0086-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/26/2019
- Present Land Use
- The project applies across all land use designations
- Document Description
- The project is limited to 6 encroachments. One encroachment is for installation of a mimumum 18 inch culvert to connect a cut bank seep to a class III watercourse. A second encroachment is to replace a failing and undersized 24 inch culvert with a minimum 30 inch culvert. A third encroachment is to replace a failing and undersized 18 inch culvert with a minimum 30 inch culvert. A fourth encroachment is to replace an undersized 12 inch culvert with a minimum 18 inch culvert. A fifth encroachment is to replace a gang of triple barreled 12 inch, 12 inch and 18 inch culverts with a minimum 30 inch culvert. A sixth encroachment is to install a minimum 18 inch culver in order to re-unite a class II water course that is currently intercepted by an inside ditch to its original channel. *SEE NOD FOR FULL DETAILS
- Contact Information
-
Timothy Smith
CDFW, Northern Region
Lead/Public Agency
619 Second St
Eureka, CA 95501
Phone : (707) 441-2091
Location
- Coordinates
- 40.1517°'"N 124.0512°'"W
- Counties
- Humboldt
- Parcel #
- 220-061-026, 220-061-027
- Waterways
- Eel River
- Township
- 3S
- Range
- 1E
- Section
- 34
- Base
- HB&M
- Other Location Info
- town of Briceland
- Other Information
- in the Briceland, U.S. Geological survery 7.5 minute quadrangle
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second Street, Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.