Nave Water Diversion Project (Lake or Streambed Alteration No. 1600-2018-0121-R1)

270 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Nave Water Diversion Project (Lake or Streambed Alteration No. 1600-2018-0121-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2019
Present Land Use
The project applies across all land use designations

Document Description
The project is limited to one 91) encroachment. The encroachment is for water diversion from Miller Creek. Water is diverted for domestic use and irrigation. The POD is stated to be a 4-foot diameter by 10-foot deep concrete cistern located on the western bank of Miller Creek. Water is pumped up hill to storage site via electric pump. Work for the water diversion will include use and maintenance of the water diversion infrastructure.

Contact Information
Greg O'Connell
CDFW, Northern Region
619 Second St
Eureka, CA 95501

Phone : (707) 441-5790

Location

Coordinates
40.1039°'"N 123.9073°'"W
Counties
Humboldt
Parcel #
220-061-026, 220-061-027
Waterways
Eel River
Township
4S
Range
2E
Section
24
Base
HB&M
Other Location Info
town of Briceland
Other Information
in the Briceland, U.S. Geological survery 7.5 minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search