Nave Water Diversion and Stream Crossings Project (Lake or Streambed Alteration No. 1600-2017-0415-R1)
806 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Nave Water Diversion and Stream Crossings Project (Lake or Streambed Alteration No. 1600-2017-0415-R1)
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2019
Present Land Use
The project applies across all land use designations
Document Description
CDFW has executed Lake and Streambed Alteration Agreement Number 1600-2017-0415-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. Nave. The project consists of four encroachment(s): The is limited to four encroachments. One encroachment is to discontinue water diversion from an Unnamed Tributary to the Klamath River. Work for this encroachment will include removal of water diversion infrastructure. The three other proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacements with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosions.
Contact Information
Name
Kalyn Bocast
Agency Name
CDFW, Northern Region
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Humboldt
Parcel #
223-123-005
Waterways
South Fork of the Eel River
Township
11N
Range
3E
Section
29
Base
HB&M
Other Location Info
town of Garberville
Other Information
in the Myers Flat, U.S. Geological survery 7.5 minute quadrangle
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.