Calofaro California's Top Shelf Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2018-0352-R1)
791 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Calofaro California's Top Shelf Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2018-0352-R1)
Document Type
NOD - Notice of Determination
Received
Posted
1/2/2019
Present Land Use
The project applies across all land use designations
Document Description
The project is limited to two encroachments. One encroachment is for water diversion from an aunnamed tributary to Powers Creek for irrigation. Work for the water diversion will include removal of existing structure, installation of new structure, and use and maintenance of upgrade water diversion. The other encroachment is to upgrade an existing culvert. Work for this encroachment will include excavation, culvert removal and replacement with new properly sized sulverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
Ruan Borque
Agency Name
CDFW, Northern Region
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Humboldt
Parcel #
216-393-006
Waterways
Powers Creek watershed
Township
4S
Range
5E
Section
7
Base
HB&M
Other Location Info
town of Alderpoint
Other Information
in the Fort, U.S. Geological survery 7.5 minute quadrangle
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.