Frisbee/Koger Water Diversion, Pond Decommission, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0531-R1)

272 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Frisbee/Koger Water Diversion, Pond Decommission, and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0531-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2018
Present Land Use
The project applies across all land use designations

Document Description
The project is limited to seven encroachments. One encroachments is for water diversion from an unnamed tributary to Mason Gulch. Water is diverted for domestic use and irrigation. Work for the water diversion will iclude use and maintenance of the water diversion infrastructure. The six other proposed encroachments are to upgrade failing and undersized culverts, and to improve the spillway at an existing pond. Work for these encroachments will include excavation, removla of the failing culverts, replacement with new property sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information
David Manthorne
CDFW, Northern Region
619 Second St
Eureka, CA 95501

Phone : (707) 441-5900

Location

Coordinates
40.9091°'"N 123.7690°'"W
Counties
Humboldt
Parcel #
316-081-004
Waterways
Willow Creek and Trinity River
Township
6N
Range
4E
Section
18
Base
HB&M
Other Location Info
town of Willow Creek
Other Information
in the Lord Ellis Summit, U.S. Geological survery 7.5 minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street., Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search