Amirault Water DIversion, Crossings and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2018-0080-R1)

735 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Amirault Water DIversion, Crossings and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2018-0080-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2018
Present Land Use
The project applies across all land use designations
Document Description
The project is limited to 8 encroachments. One encroachment is for water diversion from an unnamed spring in the Salmon Creek watershed. Water is diverted from a spring boc to storage for domestic household use only. The diversion infrastructure will be refitted as described in the revised Notification. A second encroachment is for a new diversion from a Class III stream. Water will be gravity fed through a 2-inch poly-pipe to storage for cannabis cultivation use. A third encroachment is to decommission an existing pond that is located adjacent to a class III stream. A fourth encroacvhment is to replace an existing 18-inch culvert with a minimum 30-inch culvert. A fith encroachment is to replace an existing 18-inch culvert with a minimum 30-inch culvert. A sixth encroachment is to install a minimum 24-inch culvert to carry a class III stream under an existing road. A seventh encroachment is replace an 18-inch culvert with a minimum 30-inch culvert. An eighth encroachment is to replace an 18-inch culvert with a minimum 30-inch culvert. The Permittee has disclosed a functioning and appropriately sized ditch relief culvert and a raim catchment reservoir. Work for the water diversions and crossings will include use and maintenance of the infrastructure.

Contact Information

Name
Cheri Sanville
Agency Name
CDFW, Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
220-061-016
Waterways
Eel River
Township
3S
Range
2E
Section
9
Base
HB&M
Other Information
town of Miranda

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print