McCauley Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0004-R1)

239 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
McCauley Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0004-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project is limited to seven encroachments. One encroachment is for water diversion for domestic use from a Class II spring. A second encroachment is for water diverted from an off-channel pond. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Four other encroachments are proposed to upgrade, realign, and armor cuverts at existing road/stream crossings. Work for these encroachments includes excavation, removal of culverts, replacement with a new culverts, backfillinf and compaction of fill, and rock armoring as necessary to minimize erosion. The final encroachment will remove a culvert along a stream that is encorached by cannabis cultivation. The cultivation activity will be set back to a minimum of 50 feet from any channel, and the area will be vegetated with willow springs (~130 SPRINGS) per the Notification.

Contact Information
David Manthorne
CDFW, Northern Region
619 Second St
Eureka, CA 95501

707-441-5900

Location

Coordinates
40.0427°'"N 123.590°'"W
Counties
Humboldt
Parcel #
218-091-002
Waterways
Chamise Creek
Township
5S
Range
5E
Section
11
Base
HB&M
Other Location Info
Alderpoint
Other Information
town of Alderpoint

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No