Bullock Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0751-R1)

236 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Bullock Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0751-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of 2 encroachments. The project is limited to two encroachments. First proposed encroachment is to install a rock ford with armored fill stream crossing. The second encroachment is to decommission a greenhouse cultivation area previously build on top of an ephemeral sream and restoration of that stream. Work for these encroachments will include excavation of fill material, removal of the failing culvert, replacement with new rock armored ford, and rock armoring necessary to minimize erosion. Additionally, the Permittee has disclsoed an 8-foot deep shallow well located at 40.596165, -123.683132 which is approx. 175 feet away from the nearest stream. The Permittee has also disclosed plans to build a 500,000 gallon rain water catchment pond at approx. 40.5950, -123.6835. No other water sources were disclosed for this parcel.

Contact Information
Greg O'Connell
CDFW, Northern Region
619 Second St
Eureka, CA 95501

707-441-5790

Location

Coordinates
40.5956°'"N 123.6834°'"W
Counties
Humboldt
Parcel #
317-183-007
Waterways
Mad River
Township
3N
Range
4E
Section
36
Base
HB&M
Other Location Info
Garberville
Other Information
town of Fortuna

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search