Myer Stream Crossings Project 9lake or Streambed Alteration Agreement No. 1600-2017-0350-R1)

271 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Myer Stream Crossings Project 9lake or Streambed Alteration Agreement No. 1600-2017-0350-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2018
Present Land Use
The project applies across all land use designations

Document Description
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2017-0350-R1, pursuant to Section 1602 of the Fish and Game Code to Hayley Myer The project consists of five encroachments: One encroachment is to replace an existing Humboldt crossing on a Class III watercourse. Work for this encroachment will include excavation, removal, or the failing crossing, replacement with a new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The four other proposed encroachments are to upgrade failing and undersized culvert. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information
Kalyn Bocast
CDFW, Northern Region
619 Second St
Eureka, CA 95501

Phone : (707) 441-2077

Location

Coordinates
41.3385°'"N 123.5222°'"W
Counties
Humboldt
Parcel #
529-046-016
Waterways
South Fork Trinity River
Township
3N
Range
6E
Section
19,30
Base
HB&M
Other Location Info
Town of Dinsmore
Other Information
town of Dinsmore, Blake Mountain

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search