Iliev Water Diversion, Stream Crossings, and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2017-0703-R1)

739 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Iliev Water Diversion, Stream Crossings, and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2017-0703-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2018
Present Land Use
The project applies across all land use designations
Document Description
The project is limited to four encroachments. Water is soured from a well which has not been assessed for hydrologic connectivity. The applicant has agreen to limit well extraction to 200 gallons a day from May 1st to October 31st beginning in 2019. Agricultural irrigation water will be stored prior to this date. The four proposed encroachments are to upgrade undersized culverts and improve an onstream pond spillway. Work for these encroachments will include excavation, removal of failing culverts, replacement with new properly sized culverts, backfilling and compaction of dill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
CDFW, Northern region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
210-250-020
Waterways
Butte Creek and Va Duzen River
Township
1N
Range
4E
Section
24
Base
HB&M
Other Location Info
Bridgeville
Other Information
in the Larabee Valley U.S. Geological Survey 7.5-minute quadrangle

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print