Pollette Diversion, and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2017-0491-R1)
797 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Pollette Diversion, and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2017-0491-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2018
Present Land Use
The project applies across all land use designations
Document Description
The project is limited to 2 encroachments. One encroachment is for water diversion from unnamed tributaries to Dean Creek. Water is diverted from a cistern type spring box. The spring box has three PVC distribution lines, a 1.25 and a 1.5 that are used by the parcel owner where the cistern is located and a 2 inch used by the permittee on a separately owned parcel. This agreement conditions the use of the 2 inch PVC distribution line at the Cistern. the 2 inch pVC then travels to a 250 gallon tank from which 3 additional owners receive water supply. Any distribution of water below the Cistern originating from the 2 inch line is conditioned by this Agreement. Water is used for domestic household use and fire suppression. A second encroachment is to line and existing pond and install a 12 inch spillway culvert and rock armor the outflow. Work forthe water diversion and spillway will include use and maintenance of the infrastructure.
Contact Information
Name
Timothy Smith
Agency Name
CDFW, Northern region
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Humboldt
Parcel #
223-261-005-000, 223-291-003-000
Waterways
Eel River
Township
4S
Range
4E
Section
8
Base
HB&M
Other Information
Redway
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.