Ledbetter Water Diversion, Crossing, and Ponds project (Lake or Streambed Alteration Agreement No. 1600-2017-0621-R1)

739 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Ledbetter Water Diversion, Crossing, and Ponds project (Lake or Streambed Alteration Agreement No. 1600-2017-0621-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/21/2018
Present Land Use
The project applies across all land use designations
Document Description
The project is limited to five encroachments. one encroachment is for water diversion from a small existing shallow pool area on an unnamed class II watercourse tributary to the East Branch South fork EEl River. The depth of the pool is determined by a 24 inch stream crossing culvert. Water is diverted to storage for cannabis cultivation. A second encroachment is to replace an 18 inch diameter culvert with a 24 inch diameter culvert along with critical dips and rock armoring. A third encroachment is to replace an undersized 24 inch culvert with a minimum 30 inch culvert, install critical dips and rock armoring. A fourth encroachment is to improve an unined pond located at the headwater of a class III unnamed watercourse and used for cannabis cultivation by rock armoring a 40 ft x 4 ft outlet. A fourth encroachment is to improve an unline dpond located on a class III watercourse and used for cannabis cultivation by rock armoring.

Contact Information

Name
T.O. Smith
Agency Name
CDFW, Northern region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Parcel #
223-061-049
Waterways
Eel River
Township
4S
Range
4E
Section
30
Base
HB&M
Other Location Info
Garbervile

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print