DiTuro Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0351-R1)
809 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
DiTuro Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0351-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2018
Present Land Use
The project applies across all land use designations
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0351-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. DiTuro. The project consists of six encroachment(s):
One encroachment is for water diversion from Pine Creek for domestic use and irrigation. Work for the water diversion will include facility retrofit, use and maintenance of diversion infrastructure. One encroachment is to upgrade a failing and undersized culvert to a bridge crossing. Work for this encroachment will include excavation, removal of the culvert, replacement with a bridge, channel recontouring, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Two encroachments are to conduct crossing maintenance. Work for these encroachments will include minor excavation of streambank material and rock armoring to minimize erosion. The two other proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of culverts, replacement with new properly sized culverts, backfilling and compaction, and rock armoring to minimize erosion.
Contact Information
Name
Kalyn Bocast
Agency Name
CDFW
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Humboldt
Other Location Info
Phillipsville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.