Faraon Water Diversion, Crossing and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2017-0598-R1)
535 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Faraon Water Diversion, Crossing and Pond Project (Lake or Streambed Alteration Agreement No. 1600-2017-0598-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/15/2018
- Present Land Use
- The project applies across all land use designations
- Document Description
- Project is limited to 4 encroachments. One encroachment is for water diversion from unnamed spring that is tributary to East Branch South Fork Eel River. Water is diverted from a small spring through a 1 inch poly-pipe for domestic household use and cannabis cultivation. A second encroachment is for water diversion from a small rain catchment storage pond for cannabis cultivation. A third encroachment for the permitting and maintenance of a functioning 18-inch ditch relief culvert. A fourth encroachment is for a functioning 24-inch ditch relief culvert. Work for the spring water diversion, pond diversion and stream crossings will include use and maintenance of the infrastructure.
- Contact Information
-
Timothy Smith
CDFW
Lead/Public Agency
619 Second St.
Eureka, CA 95501
Phone : (707) 441-2091
Location
- Counties
- Humboldt
- Other Location Info
- Phillipsville
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second St., Eureka, C A95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.