Buhlev Diversion, Crossing and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2017-0894-R1)

739 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Buhlev Diversion, Crossing and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2017-0894-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2018
Present Land Use
The project applies across all land use designations
Document Description
Project is limited to 5 encroachments. One encroachment is for water diversion from a drilled well. Water is diverted to storage for domestic household and cannabis cultivation use. A second diversion is from a spring at the head of an unnamed class III watercourse that is tributary to Salmon Creek. Water is diverted through a gravity fed 1.5 inch PVC pipe to storage for domestic household use. A third encroachment is to perform maintenance on the maintenance and diversion from a 250K gallon lined pond with a 12-inch outlet. A fifth encroachment is for the maintenance and diversion from a 500K gallon unlined pond located just south of the 250K pond and connected via the spillway. The pond outlet will be armored and redirected to a grassy swale to hydrologically disconnect the pond from the adjacent class II watercourse. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Work for these encroachments will include backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Timothy Smith
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
Phillipsville

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.