Porter Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0369-R1)

236 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Porter Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0369-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0369-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. Porter. The project consists of eight encroachment(s): One encroachment is for water diversion from an Unnamed Spring, a tributary to the Mad River. Water is diverted for domestic use. Work for the water diversion will include facility retrofit, use and maintenance of the water diversion infrastructure. Five proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of failing culverts, replacement with new culverts, backfilling and compaction and rock armoring. One encroachment is to upgrade an existing dirt ford. Work for this encroachment will include excavation, placement of properly sized culvert, backfilling and compaction, and rock armoring. One encroachment si to replace a pond spillway. Work for this encroachment includes removal of an undersized culvert and installation of a rock lined spillway.

Contact Information
Kalyn Bocast
CDFW
619 Second St.
Eureka, CA 95501

707-441-2077

Location

Counties
Humboldt
Other Location Info
Phillipsville

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second St., Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search