O'Brien Crossing, Pond and Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2018-0063-R1)
797 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
O'Brien Crossing, Pond and Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2018-0063-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2018
Present Land Use
The project applies across all land use designations
Document Description
Project is limited to 5 encroachments. One encroachment is for water diversion from a unnamed class II watercourse for domestic household use only. Water is gravity fed through a 1 inch poly pipe that Is reduced to a ¾ inch and then a ½ inch poly pipe and transferred to storage. A third encroachment is to replace an undersized 18 inch culvert with a 24 inch culvert and install critical dips. A fourth encroachment is to replace an undersized 15 inch culvert with a 24-inch culvert and install at critical dips. A fifth encroachment is to replace an undersized 20 inch culvert with a 30 inch culvert and install critical dips. Work for these encroachments will include excavation, removal of the undersized culverts, and replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
Timothy Smith
Agency Name
CDFW
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Humboldt
Other Location Info
Phillipsville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.