(CO14-0020)

2 Documents in Project

Summary

SCH Number
2015101096
Lead Agency
San Luis Obispo County
Document Title
(CO14-0020)
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2016
Present Land Use
Office and Professional
Document Description
A request by DR. HARVEY BILLIG for a Vesting Tentative Parcel Map and concurrent Conditional Use Permit to 1): subdivide an existing 4.9 acre parcel into two parcels of 1.46 acres and 3.44 acres; and 2) construct a 2 story 36,503 sf assisted living facility (60 beds) on the 1.46 acres parcel, and a 2 story 70,419 sf hospital (behavioral health - 91 beds) on the 3.44 acre parcel including site improvements for grading, parking, and landscaping and includes a common driveway and shared parking between the proposed buildings. The request includes a modification to the height standards for the proposed hospital to allow a ht of 44 ft (to parapet wall facing Las Tablas) instead of 35 ft as provided by ordinance. The proposed project will result in the disturbance of approximately 3.5 acres and 22,230 cy of cut and 17,260 cy fill on a 4.9 acre parcel. The project is within the Office and Professional land use category.

Contact Information

Name
Holly Phipps
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Cross Streets
Las Tablas
Total Acres
4.9
Parcel #
040-280-056
State Highways
Hwy 101
Other Location Info
Templeton

Notice of Determination

Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print