Zone E Recycled Water System Expansion MND
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015091009
- Lead Agency
- Santa Margarita Water District
- Document Title
- Zone E Recycled Water System Expansion MND
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/26/2015
- Present Land Use
- Z: RPD-14, R, CF, O'Neill Regional Park, RS-5000 PD(10000)(SR); GPD: Res. 14, Rec./OS, CF, Reg. OS, Sub. Res.
- Document Description
- The proposed project would include construction of approximately 8,000 ft (1.5 miles) of recycled water pipelines within an SMWD easement, SMWD property, and beneath existing roadways. The pipelines would range in size from 4 to 8 in. The pipelines would require excavation depths of approximately 5.5 ft within the existing easement and road rights-of-way. Once completed, the anticipated amount of recycled water would be approximately 70 acre-ft per year. The project also includes the construction of approximately 1,300 ft of a 4-in or smaller force main for future construction of a lift station located on the SMWD Upper Oso Reservoir property.
- Contact Information
-
Don Bunts
Santa Margarita Water District
Lead/Public Agency
26111 Antonio Parkway
Las Flores, CA 92688
Phone : (949) 459-6602
Location
- Coordinates
- 33°40'9.3"N 117°37'15.3"W
- Cities
- Mission Viejo Rancho Santa Margarita
- Counties
- Orange
- Cross Streets
- Meadow Ridge Drive and Chrisholm Trail
- Zip
- 92676
- State Highways
- SR 18, 19, 241
- Schools
- Portola Hills ES
- Waterways
- Upper Oso Reservoir
- Township
- 6S
- Range
- 7W
- Section
- 9
- Base
- SBB&M
Notice of Determination
- Approving Agency
- Santa Margarita Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Santa Margarita Water District, 26111 Antonio Parkway Rancho Santa Margarita, Ca 92688
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.