1028 Canada Road Werdegar Residential Development Project

2 Documents in Project

Summary

SCH Number
2015082005
Lead Agency
City of Woodside
Document Title
1028 Canada Road Werdegar Residential Development Project
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2016
Present Land Use
GPD: Residential Z: Rural Residential
Document Description
The project is part of a larger project that involves demolishing two existing main residences and nine accessory structures on 1028 Canada Road, San Mateo County. The project covered under the Lake and Streambed Alteration Agreement No. 1600-2016-0012-R3 CDFW is executing pursuant to Section 1602 of the Fish and Game Code, is limited to only the activities involving the demolition of two of the existing barns and removal of approx. six non-native blue gum eucalyptus trees within the riparian corridor of Dry Creek. The eucalyptus trees, ranging from approx. 50 to 62 inches in diameter, will be removed, and stumps set back from the bank of Dry Creek will be ground where possible without damaging and destabilizing the streambank. The stumps of the three trees situated on the bank will not be ground but will be treated with herbicide to prevent resprouting. Invasive weeds such as Himalayan blackberry, French broom and periwinkle will be removed by mechanical cutting, hand pulling, weed-wrenching and/or specific herbicide application where necessary. Native tree and shrub species will be planted to enhance and supplement the native understory trees present.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Woodside
Counties
San Mateo
Cross Streets
Runnymede Road and Olive Hill Lane
Zip
94062
Total Acres
3.93
Parcel #
072-060-430
State Highways
Hwy 84; I-280
Schools
Woodside ES
Waterways
Dry Creek, Bear Gulch Creek, Redwood Creek

Notice of Determination

Approving Agency
CDFW
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print