Proposed Fremont High School Removal Action Workplan for Areas 3 and 5

2 Documents in Project

Summary

SCH Number
2015081049
Lead Agency
Department of Toxic Substances Control
Document Title
Proposed Fremont High School Removal Action Workplan for Areas 3 and 5
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2015
Present Land Use
PF-1
Document Description
DTSC has approved a Removal Action Workplan for the Fremont High School Redevelopment Project, Areas 3 and 5 pursuant to the CA Health and Safety Code, Division 20, Chp 6.8 and California Code of Regulations, Section 25356.1. The RAW proposes the excavation and off-site disposal of approximately 2,429 cy of impacted soil from areas 3 and 5. Soil would be removed from several irregularly-shaped areas to depths ranging from 0.5 ft to 10 ft below ground surface (bgs) to address soil impacted with arsenic, lead, dieldrin, polycyclic aromatic hydrocarbons, and dioxins/furans and soil gas impacted with chloroform. The area of soil removal is approximately 22,064 sf. Should soil containing chemicals of concern above the site-specific cleanup goals remain after excavation is complete, institutional controls will be placed to protect the students, staff and visitors to the high school.

Contact Information

Name
Amit Pathak
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
7676 South San Pedro Street
Zip
90003
Total Acres
2.1
Parcel #
6022-026-900
State Highways
No
Railways
No
Airports
No
Schools
Fremont HS
Waterways
No

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print