Upper Newport Bay-East Bluff Drainage Repair Project (Lake or Streambed Alteration Agreement no. 1600-2015-0211-R5)

2 Documents in Project

Summary

SCH Number
2015071067
Lead Agency
Orange County
Document Title
Upper Newport Bay-East Bluff Drainage Repair Project (Lake or Streambed Alteration Agreement no. 1600-2015-0211-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0211-R5, pursuant to section 1602 of the Fish and Game Code to the project applicant, Orange County Parks. Project is limited to erosion repair and drainage improvements within a bluff on the eastern side of Upper Newport Bay. Activities would include landscape maintenance and vegetation clearing/grubbing, removal/replacement of concrete lining, excavation of a temporary detention basin, trenching for and installation of new pipes, installation of permanent erosion control, subdrain installation, importation of fill materials, the repair and backfill of washouts. Permanent impacts to 0.12 acre of riparian habitat will be mitigated through onsite restoration and enhancement.

Contact Information
Jennfier Turner
CDFW
3883 Ruffin Road
San Diego, CA 92123

858-636-3160

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
e/o Back Bay Drive and w/o Vista Del Oro
Zip
92660
Total Acres
1.03
State Highways
CA-55, SR-73
Airports
John Wayne
Waterways
San Diego Creek, Upper Newport Bay, Newport Harbor
Township
6
Range
10
Section
24

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3883 Ruffin Road, San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search