Upper Newport Bay-East Bluff Drainage Repair Project (Lake or Streambed Alteration Agreement no. 1600-2015-0211-R5)

2 Documents in Project

Summary

SCH Number
2015071067
Lead Agency
Orange County
Document Title
Upper Newport Bay-East Bluff Drainage Repair Project (Lake or Streambed Alteration Agreement no. 1600-2015-0211-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2016
Present Land Use
GP: Open Space Z: Upper Newport Bay Regional Park (PC-44)
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0211-R5, pursuant to section 1602 of the Fish and Game Code to the project applicant, Orange County Parks. Project is limited to erosion repair and drainage improvements within a bluff on the eastern side of Upper Newport Bay. Activities would include landscape maintenance and vegetation clearing/grubbing, removal/replacement of concrete lining, excavation of a temporary detention basin, trenching for and installation of new pipes, installation of permanent erosion control, subdrain installation, importation of fill materials, the repair and backfill of washouts. Permanent impacts to 0.12 acre of riparian habitat will be mitigated through onsite restoration and enhancement.

Contact Information

Name
Jennfier Turner
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
e/o Back Bay Drive and w/o Vista Del Oro
Zip
92660
Total Acres
1.03
State Highways
CA-55, SR-73
Airports
John Wayne
Waterways
San Diego Creek, Upper Newport Bay, Newport Harbor
Township
6
Range
10
Section
24

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print