Murphys Sanitary District Wastewater Treatment Plant Upgrade Project

6 Documents in Project

Summary

SCH Number
2015062079
Lead Agency
Murphys Sanitary District
Document Title
Murphys Sanitary District Wastewater Treatment Plant Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2016
Present Land Use
GPD: Resource production and are zoned PS
Document Description
The MSD provides wastewater collection, treatment and disposal services to the unincorporated community of Murphys and surrounding area within its service boundaries. The 2016 Project Engineering Report Update lists the following Project improvements: Relocate the existing headworks, install a new spiral screen at headworks, Paved access and working area on APN 068-014-007, install a buried valve box, replace the existing influent pumps, replace aeration system, increase Pond 4 storage capacity, replace existing disinfection system, and remove accumulated sludge from Pond 1.

Contact Information

Name
Cindy Secada
Agency Name
Murphys Sanitary District
Contact Types
Lead/Public Agency

Location

Cities
Murphys
Counties
Calaveras
Cross Streets
6 Mile Road, Fair Oaks Lane
Total Acres
25.09
Parcel #
Various
State Highways
SR 4
Schools
Albert Michelson ES
Waterways
Coyote Cr., Sixmile Cr, Utica Ditch, Angels Cr.
Township
3N
Range
14E
Section
8
Base
MDB&M

Notice of Determination

Approving Agency
MSD Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print