Biosolids Digester Facilities Project

6 Documents in Project

Summary

SCH Number
2015062073
Lead Agency
City and County of San Francisco
Document Title
Biosolids Digester Facilities Project
Document Type
FIN - Final Document
Received
Present Land Use
P (Public Facilities) ; M-1 (Light Industrial); M-2 (Industrial)
Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes to construct new solids treatment, odor control, energy recovery, and associated facilities as part of improvements to the wastewater treatment facilities at the existing Southeast Water Pollution Control Plant (SEP) in San Francisco. The proposed project, the Biosolids Digester Facilities Project (BDFP or project), would replace the outdated existing solids treatment facilities with more reliable, efficient, and modern technologies and facilities. Biosolids are the recyclable solid materials removed from the wastewater during the treatment process, and digesters are the major facility used in the solids treatment process. Many of the existing SEP solids treatment facilities are over 60 years old, require significant maintenance, and are operating well beyond their useful life. The project would replace the existing digesters with new digesters and other new facilities that would produce higher-quality biosolids, capture and treat odors more effectively, and maximize digester gas utilization and energy recovery for the production of heat, steam, and electrical power. In addition, the project intends to locate the digesters farther away from existing residences, limit project-generated odors to the SEP fence line, and make visual improvements in and around the SEP. Nine structures totaling about 136,000 square feet of building area, all of which are less than 65 feet tall, would be demolished at the project site and construction staging areas. The structures to be demolished were built between 1952 and 2009. The project would construct 22 above- and below-ground facilities on about 206,000 square feet of the project site. The tallest new buildings would be 65 feet tall; the tallest new structure, an exhaust stack, would be 75 feet tall. The SFPUC anticipates that project construction would require five years to complete, from 2018 through 2023, followed by performance testing and full facility commissioning, anticipated to be completed in 2025. The project site is located in the southeast part of San Francisco, bordered by a freight rail spur and the Caltrain right-of-way on the west, Rankin Street on the northwest, and the existing SEP on the northeast, east, and southeast. The project facilities would be situated on portions of the SEP located at 750 Phelps Street and 1700 Jerrold Avenue, and two adjacent properties at 1800 Jerrold Avenue and 1801 Jerrold Avenue. The project site encompasses approximately 562,600 square feet (13 acres). The project would require temporary use of other off-site locations for construction staging and construction employee parking. The BDFP would require up to 12 acres for construction staging at one or more sites in addition to the project site itself; sites under consideration include the Southeast Greenhouses site at 1150 Phelps Street, 1550 Evans Avenue, and portions of Piers 94, 96, and the Pier 94 Backlands. Staging would also occur on a temporarily closed segment of Jerrold Avenue and permanently closed segment of Quint Street. The Draft EIR can be viewed online at http://sf-planning.org/sfpuc-negative-declarations-eirs. CDs and hard copies of the Draft EIR are available for public review and comment at: (1) San Francisco Planning Department, Planning Information Counter at 1660 Mission Street, 1st Floor, San Francisco; (2) San Francisco Main Library at Civic Center, 100 Larkin Street, San Francisco; and (3) Bayview Public Library, 5075 3rd Street, San Francisco. In addition, referenced materials are available for review at the San Francisco Planning Department offices at 49 South Van Ness Ave, #1400, San Francisco, CA 9i4103.

Contact Information

Name
Timothy Johnston
Agency Name
San Francisco Planning Department
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Regions
Citywide
Cross Streets
Jerrold Avenue and Quint Street
Zip
94124
Total Acres
25
Jobs
1
Parcel #
5262/009; 5281/001
State Highways
101, I-280
Railways
CalTrain
Schools
Various
Waterways
Islais Creek, San Francisco Bay

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Waste Treatment:Sewer (Wastewater)(MGD 85)
Local Actions
SFPUC Approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.