Facebook Campus Expansion Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015062056
- Lead Agency
- City of Menlo Park
- Document Title
- Facebook Campus Expansion Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/4/2016
- Present Land Use
- The Project site is zoned M-2 (General Industrial) and M-2-X (General Industrial, Conditional Development).
- Document Description
- The Project includes the demolition of buildings at the site and the construction of two new office buildings (Building 21 and Building 22), encompassing approximately 962,400 gsf. The proposed Bldg 21 would contain approx. 512,900 sf of office and event uses and be located on the eastern portion of the Project site. The proposed Building 22 would include approximately 449,500 sf of office uses and would be located on the western portion of the Project site. Maximum building heights would be approximately 75 feet. The Project would also include the potential for a 200-room limited-service hotel with approximately 174,800 sf of space (Building 24) in the northwestern portion of the Project site. Project includes removal of 274 heritage trees.
- Contact Information
-
Kyle Perata
City of Menlo Park
Lead/Public Agency
701 Laurel Street
Menlo Park, CA 94025
Phone : (650) 330-6721
Location
- Coordinates
- 37°28'50.2"N 122°10'1.1"W
- Cities
- Menlo Park
- Counties
- San Mateo
- Cross Streets
- Bayfront Expressway (SR 84) / Chilco Street
- Zip
- 94025
- Total Acres
- 58
- Parcel #
- 055-260-250
- State Highways
- SR 82, US 101, SR 114
- Railways
- Dumbarton ROW
- Schools
- Belle Haven, Beechwood
- Waterways
- SF Bay, Ravenswood Slough
- Township
- 5S
- Range
- 3W
- Section
- 23
Notice of Determination
- Approving Agency
- City of Menlo Park
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 701 Laurel Street, Menlo Park, CA 94025
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.