Upper Main Ditch Piping Project

4 Documents in Project

Summary

SCH Number
2015062049
Lead Agency
El Dorado Irrigation District
Document Title
Upper Main Ditch Piping Project
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2019
Document Description
The Project includes construction of a new pipe connection downstream of the Forebay valve house, piping of the flows currently conveyed through the ditch, and improvements to the inlet facility at the Reservoir 1 WTP to include construction of a new metering vault and a new energy dissipation structure at the end of the discharge pipe.

Contact Information

Name
Brian Deason
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Name
Agency Name
ELID
Contact Types
Project Applicant

Location

Cities
Pollock Pines
Counties
El Dorado

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print