Upper Main Ditch Piping Project
4 Documents in Project
Summary
SCH Number
2015062049
Lead Agency
El Dorado Irrigation District
Document Title
Upper Main Ditch Piping Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Property owned by EID and private landowners, public rights-of-way, Project 184 FERC license boundary
Document Description
The purpose of the Project is to replace a 3-mile section of water supply ditch with a buried pipeline which would convey raw water while reducing water leakage and losses, and improving the quality of water entering the Reservoir 1 Water Treatment Plant. Three potential alignments have been identified at the time of the NOP, which are currently being analyzed by EID to determine construction feasibility, and operation and maintenance costs prior to selecting a preferred alignment. It is possible that further analysis of site specific conditions may necessitate revisions to these alignments that will be carried forward for further CEQA analysis.
Contact Information
Name
Kristin Schaeffer
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
El Dorado
Cross Streets
Forebay Rd, Blair Rd, Gilmore Rd, Patrick Ln, Pinewood Ln, and Pony Express Ct
Zip
95726
State Highways
Hwy 50
Schools
Pinewood ES
Waterways
South Fork of Long Canyon Creek
Township
11N
Range
12/13E
Section
25/36
Base
MDB&M
Other Location Info
Pollock Pines
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Divison of Financial Assistance, Cal Fire, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
Cal Fire, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (Raw Water Ditch Piping)
Local Actions
Public Facility
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.