Chromium-6 Water Treatment System Project (Lake or Streambed Alteration Agreement No. 1600-2016-0104-R3)

4 Documents in Project

Summary

SCH Number
2015062021
Lead Agency
Soquel Creek Water District
Document Title
Chromium-6 Water Treatment System Project (Lake or Streambed Alteration Agreement No. 1600-2016-0104-R3)
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2016
Present Land Use
Public and Community Facilities, public right-of-way

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0104-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Michael Wilson/Soquel Creek Water District. The project consists of the construction of a well head water treatment system to treat naturally-occurring hexavalent chromium (chromium-6). Construction includes the building of a 16.6 feet in width and 45.4 feet in length new access bridge, the removal of up to 4 spruce trees ranging in diameter at breast height from 9 to 12 inches, a new raw water pipeline from the Soquel Creek Water District's Seascape well to the San Andreas well, replacement of groundwater pumps, and a new sewer force main.

Contact Information
Monica Oey
CDFW
7329 Silverado Trail
Napa, CA 94558

Phone : (707) 944-5575

Location

Coordinates
36°58'59"N 121°53'45"W
Counties
Santa Cruz
Cross Streets
Bonita Drive and San Andreas Road
Zip
95003
Total Acres
.96
Parcel #
053-131-17
State Highways
Hwy 1
Railways
SPRR
Schools
St. Abraham's Classical
Waterways
Pacific Ocean
Township
11S
Range
1E
Section
7
Other Location Info
Aptos

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search