Stream and Diffuser Enhancement Project (Streambed Alteration Agreement No. 1600-2015-0141-R2)

2 Documents in Project

Summary

SCH Number
2015052067
Lead Agency
Quincy Community Services District
Document Title
Stream and Diffuser Enhancement Project (Streambed Alteration Agreement No. 1600-2015-0141-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2015
Present Land Use
Agricultural Preserve
Document Description
CDFW has executed streambed alteration agreement no. 1600-2015-0141-R2, pursuant to section 1602 of the fish and game code to the project applicant, Quincy Community Services District (the Permittee) as represented by Larry Sullivan. The project consists of installation of a boulder cross-vane into Spanish Creek where the diffuser pipe is located. The boulder cross-vane will increase the immediate, on-site stream gradient, concentrate flows towards the center of the channel and its upstream end, increase streamflow velocities and turbulence within the structure and disperse flows across the channel at its downstream end. In order to construct the boulder cross-vane, an access road will be built along the south bank of Spanish Creek. The access road will be constructed using gravel from the gravel bar. The access road will be removed following construction of the boulder cross-vane. A coffer dam will be constructed to dewater the creek to allow for the installation of the cross-vane. Additional stream enhancements within Spanish Creek include: removal of a downstream sheet-pile dam that causes Spanish Creek to back up and create two large gravel bars. Following removal of the sheet-pile dam, approximately 700 cy of gravel will be removed from the creek to lower the creek to its active floodplain elevation. To help manage cattle use in the stream and riparian areas, the two fence segments that cross the creek will be removed and a new fence containing two gates will be installed on top of the north-side bank. The two gates will help provide cattle access to water and the landowner access to his irrigation pump. A temporary water gap fence will be installed. This temporary fence will be removed each year prior to the winter season. Project will result in 0.02 acres of permanent impacts in stream from installation of the cross-vane. 0.02 acres of temporary impacts to un-vegetated stream bank will occur from installation of the access road.

Contact Information

Name
Kursten Sheridan
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Quincy
Counties
Plumas
Cross Streets
Off of SR 70 at the end of Spanish Creek Road
Zip
95971
Total Acres
6.4
Parcel #
115160060; 005240028
State Highways
Hwy 70
Railways
Yes
Airports
Quincy
Schools
Yes
Waterways
Spanish Creek
Township
24N
Range
9E
Section
11/12
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print