Mazzone Bridge Construction (Streambed Alteration Agreement No. 1600-2016-0383-R3)

2 Documents in Project

Summary

SCH Number
2015052036
Lead Agency
City of San Jose
Document Title
Mazzone Bridge Construction (Streambed Alteration Agreement No. 1600-2016-0383-R3)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2017
Present Land Use
GPD: Residential Neighborhood, Open Space, Parklands, and Habitat Z: Agriculture
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0383-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, DAL/Edenbridge San Jose 8, L.P. Project includes installation of a bridge and storm drain outfall. A pre-cast bridge measuring 22 feet wide and 50 feet long will be installed over Golf Creek, above top of bank. The bridge will clear span the entire creek and be placed over the existing box culverts. Bridge piles will be cast in drilled hole concrete and abutments will be poured concrete. A new 12 inch storm drain outfall will be installed in the south wingwall. Trenching will occur and pipe will be laid between a new storm drain manhole and the wingwall.

Contact Information

Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
East side of Almaden Expressway, approximately 300 feet north of Fleetwood Drive
Zip
95120
Total Acres
1.81
Parcel #
696-01-020
Waterways
Golf Creek and Alamitos Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print