13th Street Bridge Replacement at the Santa Ynez River Crossing, Vandenberg Air Force Base, CA

2 Documents in Project

Summary

SCH Number
2015044002
Lead Agency
U.S. Air Force
Document Title
13th Street Bridge Replacement at the Santa Ynez River Crossing, Vandenberg Air Force Base, CA
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2015

Document Description
Construct a new bridge and approach roads on 13th Street over the Santa Ynez River, demolish and remove the existing bridge and approach roads, and install a fiber optic communication cable 25 feet under the riverbed approximately 1,100 feet west of the existing bridge. Temporarily restore disturbed areas, reestablish aquatic and riparian habitat in areas impacted by the existing bridge, and establish a wetland mitigation area in the Santa Ynez River estuary if additional mitigation is necessary to compensate for permanent project impacts.

Contact Information
Jon Rohrbough
Central Coast Water Board
895 Aerovista Place, Suite 101
San Luis Obispo, CA 93401

Phone : (805) 549-3458

Location

Coordinates
34°40'38"N 120°33'15"W
Cities
Lompoc
Counties
Santa Barbara
Cross Streets
13th Street x Hwy 246 (Ocean Ave)
Zip
93437
Total Acres
141.5
State Highways
Hwy 246
Railways
UPRR
Waterways
Santa Ynez River

Notice of Determination

Approving Agency
Central Coast Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Central Coast Regional Water Quality Control Board, 895 Aerovista Place, Suite 101, San Luis Obispo, CA 93101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes