Wojcik Reclamation (Restoration) Plan (Lake or Streambed Alteration Agreement No. 1600-2018-0360-R1)

2 Documents in Project

Summary

SCH Number
2015042037
Lead Agency
Humboldt County
Document Title
Wojcik Reclamation (Restoration) Plan (Lake or Streambed Alteration Agreement No. 1600-2018-0360-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2019
Present Land Use
Agricultural Lands / Timber Production / Agricultural Lands and Timber Production
Document Description
The project is a reclamation plan proposed as a result of a Surface Mining and Reclamation Act violation where unpermitted mining activities took place with a rare form of wetland (peatland) called the Van Duzen Fen. Unpermitted mining activities consisted of extraction of peat from within the fen, water diversion, unpermitted grading, and other violation of Fish and Game Code, Water Code, and County Code. The reclamation Plan is proposed for the sole purpose of restoring natural biological ad hydrological conditions and processes to the Van Duzen Fen and nearby areas also disturbed by prior non-permitted mining activities. No further mining is proposed with implantation of the Reclamation Plan.

Contact Information

Name
Michael van Hattem
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Highway 36 and McClellan Mountain Road
Zip
95526
Total Acres
8
Parcel #
Multiple
State Highways
Hwy 36
Waterways
Van Duzen River
Township
BELOW
Range
BELOW
Section
BELOW
Base
BELOW
Other Location Info
Bridgeville
Other Information
*SEE NOD FOR FULL DETAILS.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print