Arcadia Logistics Center

5 Documents in Project

Summary

SCH Number
2015041002
Lead Agency
City of Arcadia
Document Title
Arcadia Logistics Center
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2016
Present Land Use
Former Quarry and Current Inert Debris Engineered Fill Operation/Commercial-Light Industrial
Document Description
The project consists of a general plan amendment (GPA 15-02), Specific Plan (SP 14-01), and Tentative Parcel Map (TPM 14-06 (73407)). GPA 15-02 revises the text under general plan policy ED-1.4 to support the re-se of the Lower Azusa Road Reclamation Area as a master-planned warehousing and logistics center. SP 14-01 implements the City of Arcadia's General Plan within the boundary of the subject property and establishes a set of development standards and design guidelines for the planned development of logistics center buildings that would provide up to 1,688,00 sf of building space. TPM 14-06 (73407) subdivides the subject property into Parcels 1-6 and Lots A-F to enable development of the site.

Contact Information

Name
Jim Kasama
Agency Name
City of Arcadia
Contact Types
Lead/Public Agency

Location

Cities
Arcadia
Counties
Los Angeles
Cross Streets
12321 Lower Azusa Road, at Lower Azusa Road and Durfee Avenue
Zip
91006
Total Acres
81.27
Parcel #
8541-017-027,-028
State Highways
I-10, I-605
Airports
El Monte
Schools
Cherrylee, Durfee, Norwood
Waterways
San Gabriel River
Township
1S
Range
11W
Section
14
Base
SBB&M

Notice of Determination

Approving Agency
City of Arcadia
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print