City of Shasta Lake Wastewater Treatment Facility Upgrade (Lake or STreambed Alteration Agreement No. 1600-2017-0178-R1)

4 Documents in Project

Summary

SCH Number
2015012033
Lead Agency
City of Shasta Lake
Document Title
City of Shasta Lake Wastewater Treatment Facility Upgrade (Lake or STreambed Alteration Agreement No. 1600-2017-0178-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2017
Present Land Use
Public Facilities Land Use Designation and Zoning District
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-017-R1, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Shasta Lake. Project is limited to the portion of the City of Shasta Lake Wastewater Treatment Facility Upgrade Project (Project) where the proposed outfall will be installed to discharge treated water into Churn Creek. A pipeline will lead from the treatment plant to the proposed outfall and part of the pipeline will be constructed within the riparian zone and bank of Chun Creek. The new 24-inch diameter outfall will be installed to replace the existing 8-inch outfall. The existing outfall will be abandoned in place. The new outfall will disturb or remove 35 cubic yards of soil and will have an approx. 100 sq. ft. footprint and result in approx. 0.01 acres of permanent impacts to the riparian area and .054 acres of temporary impacts to the riparian area. Rock slope protection for the outfall structures will include approx. 16 cubic yards of angular rock underlain with fabric and will be placed on the bank and within the riparian area according to submitted plans.

Contact Information

Name
Kate Grossman
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Shasta Lake
Counties
Shasta
Cross Streets
Pine Grove Avenue and Tibbitts
Zip
96019
Total Acres
106
Parcel #
064-150-070, 064-160-005 & 007
State Highways
Hwy 5
Railways
UPRR
Schools
Central Valley HS
Waterways
Churn Creek
Township
32N
Range
5W
Section
1

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA